For new work in climate zone 4, which covers most of the Lower Mainland, the BC Building Code prescriptive path sets these minimums: attic ceilings RSI 6.91 (about R-39), above-grade walls RSI 2.78 (about R-16), floors over unheated space RSI 4.67 (about R-26.5) and foundation walls RSI 1.99 (about R-11).
The minimums in climate zone 4
| Part of the house | Minimum RSI | About R |
|---|---|---|
| Attic, ceiling below the attic | 6.91 | 39 |
| Above-grade walls | 2.78 | 16 |
| Floors over unheated space | 4.67 | 26.5 |
| Foundation walls | 1.99 | 11 |
Effective values from the BC Building Code 9.36 prescriptive path for climate zone 4. R ≈ RSI × 5.678. Your municipality confirms the climate zone for your address.
Effective is not the number on the bag
These are effective values for the whole wall, ceiling or floor, framing included. Wood conducts more heat than insulation, so the batt or blown-in layer itself has to be rated higher than the effective number.
Does this apply to my existing home?
The code sets minimums for new construction and for the parts you renovate. An existing attic doesn't have to be brought up to code, but these numbers are a useful target. Many homeowners go above the minimum when they top up an attic, because the attic is the easiest place to add more.
What about the BC Energy Step Code?
Many Lower Mainland municipalities require new homes to meet a step of the BC Energy Step Code. That can mean more insulation than the prescriptive minimums. Builders should check with their municipality and energy advisor before pricing.
How to read a quote
A good quote lists the R-value, the square footage and the type of insulation for each area. For blown-in attics it should also give the installed depth, so you can check it with a tape measure.
Quick answers
What R-value does an attic need in Vancouver or Surrey?
For new work in climate zone 4, the BC Building Code minimum for attic ceilings is RSI 6.91, about R-39. Many homeowners top up beyond that.
What is the difference between RSI and R?
RSI is the metric value. Multiply RSI by about 5.678 to get the imperial R-value.
Do I have to bring my old house up to code?
No. The code applies to new construction and to work you are doing. It is still a good target when topping up.
Related guides
- Signs your home needs more insulationThe signs a Lower Mainland home is short on insulation, and the clues that show a problem has been building for years.
- When old insulation should come outPest, water and age damage, when to top up versus remove, and what to know about vermiculite and asbestos.
- Why your floors feel coldCold floors usually trace back to the crawlspace, rim joists or air leaks. Here is how to tell which.